Q4 2009 Budget

Total Allocation $7000

Line Item Expected Cost Allocated Funds Notes
SCaLE $500 $500 General Event Funds
BarCamp CLT $250 $250 General Event Funds
Media x86 install $1800 $1800
Media x86_64 install $1800 $1800
Media x86_64 Live $1800 $0 Insufficient Funds Available
Persistent infrastructure (banners and signs) $XXXX(1) $0 Insufficient Funds Available
Case badges $XXX(2) $0 Insufficient Funds Available
AmbKits $100 $100 R&D
Tshirts $1383.02 (actual cost) $1000 300 Fedora T-shirts
Tattoos $250 $125 5000 Fedora Logo Tattoos (2500 funded)
Additional Event Box $500 $500 Event box plus posters and signs
Shipping $500 $500 Hope that I am way over estimating this
FADNA $600 $425 Assuming FADNA @ SCaLE
TOTAL $9100 $7000

This is a ROUGH guide - and designed to be flexible. NA will sacrifice things such as Event Box and limit shipping if needed to get additional events or in the event that FADNA needs more money.

(1) Persistent infrastructure costs are those associated with improving the Fedora presence at larger events and might include things like an 8'x8' booth backdrop or large banner stands. These costs are intended to be one time expenses. Something like an 8'x8' booth backdrop would add recurring additional shipping charges. Large banner stands could fit into event boxes and have minimal impact on shipping costs.

(2) Need to price case badges ...