== Important Milestones ==
== Important Milestones ==


* New features may be proposed (using the guidelines described elsewhere) and accepted by the Fedora Engineering Steering Committee (FESCo) up until two weeks before the '''Feature Freeze''' milestone.
* New features may be proposed (using the guidelines described elsewhere) and accepted by the Fedora Engineering Steering Committee (FESCo) up until the '''Feature Submission Deadline'''
** Two weeks before the '''Feature Freeze''' milestone.
** FESCo will consider features proposed after this deadline on an exception basis
** FESCo will consider features proposed after this deadline on an exception basis
* New features must be feature complete or close enough to completion by Alpha freeze that a majority of its functionality can be suitably tested--the "feature is testable".
* New features must be feature complete or close enough to completion by Alpha freeze that a majority of its functionality can be suitably tested--the "feature is testable".

Revision as of 23:06, 6 January 2010

Important Milestones

  • New features may be proposed (using the guidelines described elsewhere) and accepted by the Fedora Engineering Steering Committee (FESCo) up until the Feature Submission Deadline
    • Two weeks before the Feature Freeze milestone.
    • FESCo will consider features proposed after this deadline on an exception basis
  • New features must be feature complete or close enough to completion by Alpha freeze that a majority of its functionality can be suitably tested--the "feature is testable".
    • Feature complete means that the code required to enable to the new feature is finished. This is reflected as a percentage. It does not mean the feature has been fully tested.
    • Testing new features happens during the Alpha and Beta releases.
  • After feature freeze the Feature Wrangler will present a list of all the features that are not 100% complete or lack evidence of "testability." FESCo will review these feature to determine if they should remain as features of the current release.
  • After FESCo's review of incomplete features the final feature list will be publicly announced by the Feature Wrangler.


Idea.png
Testable does not mean a small portion of the feature is complete and can be tested while a significant portion of the remaining functionality has not been completed and may not yet be tested. We are attempting to provide some flexibility here without completely losing the understood meaning of feature freeze.