From Fedora Project Wiki

(Fix estimates for morning breaks)
Line 22: Line 22:
! colspan=7 | Food, drink, hospitality
! colspan=7 | Food, drink, hospitality
|-
|-
| Coffee/danish for 150 (Sat) ||  ||  ||  ||  ||  || $1,500
| Coffee/danish for 150 (Sat) ||  ||  ||  ||  ||  || $ 750
|-
|-
| Coffee/danish for 150 (Sun) ||  ||  ||  ||  ||  || $1,500
| Coffee/danish for 150 (Sun) ||  ||  ||  ||  ||  || $ 750
|-
|-
| FUDPub food & space (Sat) ||  ||  ||  ||  || $4,000 ||
| FUDPub food & space (Sat) ||  ||  ||  ||  || $4,000 ||
Line 44: Line 44:
| Travel subsidies, airfares and hotel ||  ||  ||  ||  ||  || $8,500
| Travel subsidies, airfares and hotel ||  ||  ||  ||  ||  || $8,500
|-
|-
! TOTALS <!-- Ugh, manual. --> !! $1,000 !! $1,000 !! $1,200 !! $3,200 !! $6,150 !! $12,775
! TOTALS <!-- Ugh, manual. --> !! $1,000 !! $1,000 !! $1,200 !! $3,200 !! $6,150 !! $11,275
|}
|}


Running total: ''$25,325''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.
Running total: ''$23,825''. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.


'''Important note:''' This really doesn't raise the budget for FUDCon to >$25K.  Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.
'''Important note:''' This really doesn't raise the budget for FUDCon to >$25K.  Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.

Revision as of 12:51, 26 August 2010

This page tracks the budget for the FUDCon:Tempe 2011 event.

Estimates

Key: FE = Fedora Engineering; CA = Community Architecture. Hotel costs are expressed as $600 for 3 nights, double occupancy. So for every 2 people, it's a $600 cost.

Estimated cost
! Item FE Q2 CA Q2 FE Q3 CA Q3 FE Q4 CA Q4
Facilities
UTO (tech support) overtime (Sun) $ 750
MemU rooms and equipment (Mon) $ 500
Deposit for hotel block $1,000
Printing and materials (badges, etc.) $ 500
Food, drink, hospitality
Coffee/danish for 150 (Sat) $ 750
Coffee/danish for 150 (Sun) $ 750
FUDPub food & space (Sat) $4,000
Swag $1,500
Blue Disposable Earplugs - 200 count $25
Travel
3@ Airfare from Fedora Eng $1,000
12@ Hotel from Fedora Eng $2,150
4@ Airfare from Fedora Eng $1,200
4@ Airfare from Fedora Eng $1,200
Travel subsidies, airfares and hotel $8,500
TOTALS $1,000 $1,000 $1,200 $3,200 $6,150 $11,275

Running total: $23,825. Don't panic. Some of these costs can be spread to Q2 and Q3, and also to the 810 cost center which has a significant set aside.

Important note: This really doesn't raise the budget for FUDCon to >$25K. Because the Fedora Engineering team is using standard travel budget in Q2 and Q3, along with a set-aside in Q4, and since Community Architecture spreads some of its costs around too, we can conserve against the standard $20K allotment.